Grey Structure Services

  1. Grey Structure Checklist
  2. Learning and marking as per drawing specification.
  3. Water BOR (if required)
  4. Digging of plots as per drawing specification.
  5. P.C.C filing & compaction as per drawing specification.
  6. Termite proofing underground (with warranty certificate for 10 years).
  7. D.P.C setup with (maximum of 2.5 feet below road level).
  8. Seepage treatment on base with compund chemical + chips (as pre drawing shape)
  9. Filling of plot (max dept 2 feet or as decided extra charges).
  10. Masonry work till door linter as per drawing (1st class ENT + plus cement).
  11. Door base of metal (16 gage with compound treatment)
  12. Door base of metal (16 gage with compound treatment).
  13. Door base of metal (16 gage with compound treatment)
  14. Door linters (inclusive of shades)
  15. R.C.C slab (as per drawing specification including beams).
  16. Elevation shape up as per drawing (or 3D)
  17. Plaster inside & outside (excluding roof if ceiling to be made)
  18. Staircase till plaster (extra charges for metal staircase).
  19. Sewerage piping (C.I) inside baths, kitchen underground etc.(Popular or as decided).
  20. Sanitary piping (G.I) inside water + gas (as per drawing) PPRC.
  21. Electric underground piping (as per drawing) Popular.
  22. Termite treatment on ground floor before P.C.C
  23. Cemented floors with water leveling as per drawing specification.
  24. Roof top completion plus heat insulation (plastic,coal,tar,tiles,etc.)