- Grey Structure Checklist
- Learning and marking as per drawing specification.
- Water BOR (if required)
- Digging of plots as per drawing specification.
- P.C.C filing & compaction as per drawing specification.
- Termite proofing underground (with warranty certificate for 10 years).
- D.P.C setup with (maximum of 2.5 feet below road level).
- Seepage treatment on base with compund chemical + chips (as pre drawing shape)
- Filling of plot (max dept 2 feet or as decided extra charges).
- Masonry work till door linter as per drawing (1st class ENT + plus cement).
- Door base of metal (16 gage with compound treatment)
- Door base of metal (16 gage with compound treatment).
- Door base of metal (16 gage with compound treatment)
- Door linters (inclusive of shades)
- R.C.C slab (as per drawing specification including beams).
- Elevation shape up as per drawing (or 3D)
- Plaster inside & outside (excluding roof if ceiling to be made)
- Staircase till plaster (extra charges for metal staircase).
- Sewerage piping (C.I) inside baths, kitchen underground etc.(Popular or as decided).
- Sanitary piping (G.I) inside water + gas (as per drawing) PPRC.
- Electric underground piping (as per drawing) Popular.
- Termite treatment on ground floor before P.C.C
- Cemented floors with water leveling as per drawing specification.
- Roof top completion plus heat insulation (plastic,coal,tar,tiles,etc.)