Turnkey Construction Services

Full house Construction Starting From 2000/sqft with all material and labor

 Finishing Items Checklist

  1. Ceiling plus finishing; stylish designs as customized by professionals
  2. Electric wiring(G.M) underground (as per drawing)
  3. Marble or tile flooring range ( approx. 1200/sq. meter )
  4. Marble slabs on stair case granite (approx. 600/sq. meter)
  5. Metal railing on staircase
  6. Laminate floor in dining (if required approx. 1200/sq. meter)
  7. Base filling putty on walls (Nippon)
  8. All doors of solid wood (diyar or as decided)
  9. Laminate sheets back box + solid wood front doors on cupboards (as per drawing)
  10. cabinet plus plasma outfit in T.V lounge as decided (laminate sheet)
  11. Kitchen back boxes of laminate sheets and front panels of solid wood also kitchen will include:-
  • Tiles on floor and wall(approx. 1200/sq. meter)
  • Marble slabs (approx. 600/sq. meter)
  • Chrome fitting and accessories sonex/master as decided.
  • Hood designed with (laminate sheet front of solid wood)
  • Sink bowl stainless steel
  • Electric stove range (up to 15000)
  1. Lavatory tiles range (approx. 1200/sq. meter)
  2. Marble vanities (approx. 600/sq. meter)
  3. Lavatory accessories(as decided)
  4. Lavatory accessories(as decided)
  5. Chromed taps and fittings(as decided)
  6. Glass finished /extensive designed showers
  7. Fall lights on ceiling(as decided)
  8. Switch plates (as decided)
  9. Fancy wall lights (as decided)
  10. Chandelier in drawing
  11. Exterior lights/boundary wall/gate
  12. Outside marble; garage terrace, Gali.
  13. Paint work; plastic emulsion on walls and distemper on top
  14. Polish and elfin varnish designed finishing on panel and woodwork
  15. Outside giraffe /weather sheet
  16. Metal paint on grills & gate & railing
  17. Aluminum windows (1.3 mm+5mm glass)